ENCE606

Graduate Introduction to Project Scheduling

Students are taught the basics of project scheduling and the various scheduling approaches that are currently being used in the design and construction industry. Project planning techniques will be covered and basic scheduling methods will be taught including the use of bar charts. Critical Path Method (CPM), Program Evaluation and Review (PERT) and Linear Scheduling (Line of Balance) methods.

Past Semesters

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

During the Spring 2020 and Spring 2021 semesters, students could choose to take some of their courses pass-fail mid-semester which skews grade data aggregated across multiple semesters.

Average GPA of 3.38 between 64 students*

ENCE606 Grade Distribution+-05101520253035404550556065% of studentsABCDFWother
A-: 10.94%
A: 23.44%
A+: 28.13%
B-: 4.69%
B: 12.5%
B+: 12.5%
F: 1.56%
W: 6.25%
* "W"s are considered to be 0.0 quality points. "Other" grades are not factored into GPA calculation. Grade data not guaranteed to be correct.