ENCE627

Project Risk Management

Restriction: Must not have completed ENCE627. Introduction to identifying, analyzing, assessing, and managing risks inherent to engineering projects. Includes: probability modeling, choice and value theory, schedule and cost risk, risk mitigation and transfer, and contract considerations of project risk. Examples are drawn from construction, software development, systems integration, and other large engineering projects; and cover probability basics, subjective probability, statistical data analysis, introduction to decision theory, Monte Carlo simulation, value of information, and risk-based decision making.

Spring 2026

0 reviews
Average rating: N/A

Fall 2025

0 reviews
Average rating: N/A

Spring 2025

0 reviews
Average rating: N/A

Past Semesters

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

0 reviews
Average rating: N/A

During the Spring 2020 and Spring 2021 semesters, students could choose to take some of their courses pass-fail mid-semester which skews grade data aggregated across multiple semesters.

Average GPA of 3.28 between 531 students*

ENCE627 Grade Distribution+-0510152025303540455055% of studentsABCDFWother
A-: 1.69%
A: 37.1%
A+: 1.51%
B-: 0.19%
B: 50.28%
B+: 3.58%
C: 1.32%
W: 3.95%
other: 0.38%
* "W"s are considered to be 0.0 quality points. "Other" grades are not factored into GPA calculation. Grade data not guaranteed to be correct.